Aller au contenu
Résultats

Construction of a general and technological high school – Pibrac

Façade extérieure Lycée Pibrac

PROGRAM :

Construction of a 1000-student general and technological high school (+ planned extension to 1500 students)

Surface : 9000 m²

QEB ELEMENTS

  • Effinergie 2013 BEPOS level
  • 400 kWp photovoltaic power plant for self-consumption and sale of surplus
  • Geothermal energy on vertical probes
  • Geocooling
  • Electrical power optimizer (subscribed power divided by 2)

OUR MISSION :

Project project management

BASE + EXE2 + Energy monitoring

Accompaniment QEB

1ere annee exploitation :

Photovoltaic power plant

  • PV production : 313 MWhef (31 % self-consumption)
  • In line with forecasts

Building

  • Consumptions all uses :
  • 385 MWhef (autoconso. PV deducted)
  • 34 kWhep/m²SP

Main corrective actions :

  • Complete shutdown of CTAs during vacation periods
  • Heating/geocooling circuit shutdown not required
  • Pibrac (81)
  • Région Midi Pyrénées
  • 2017
  • 9000 m²