Aller au contenu
Résultats

CONSTRUCTION OF LOGISTICS PLATFORM – NESTLE

OUR MISSION :

Design and realization ” turnkey ” of a logistics platform for CFF (Nestlé group). 

  • Warehouse attached to production site.
  • Installation of an automatic conveyor between the production site and the logistics warehouse
  • .
  • Leasing solution
  • ITANCOURT
  • NESTLE
  • 2005
  • 18 000m²