Aller au contenu
Résultats

CONSTRUCTION OF WASTEWATER TREATMENT PLANT – SIEPAM

Syndicat intercommunal eau et assainissement des Moulin

OUR MISSION :

Project management assistance, design and construction.

PROGRAM :

Programming. Technical validation, MOE and works.

EXISTINGPROBLEMS :

  • Creation of a 28,000 EQH WWTP
  • Seasonal load variation (1 to 8)
  • Network collected from 900 to 1,500 m altitude
  • Water treatment by membrane process
  • Sludge treatment by centrifugation
  • Collection network with overhead crossings (220 m span, ON 250)
  • Saint-Nicolas-La-Chapelle
  • Syndicat Intercommunal d’eau potable et d’assainissement des eaux des Moulins.
  • 2012