Aller au contenu
Résultats

CREATION OF A HYDROELECTRIC MICRO-POWER STATION – TORRENT DU TACONNAZ

Taconnaz (1)

OUR MISSION :

  • 2015  : Call for projects for the design, construction and operation of a hydroelectric power plant on the Taconnaz torrent.  Assembly of the VOLTALIA/GIRUS/BENEDETTIGUELPA consortium and completion of a detailed feasibility study.
  • 2016 – 2019 : Integrated mission of complete MOE (AVP, PRO, VISA, DET, OPC, AOR) including the Impact Study, the realization of the Dossier de Demande d’Autorisation d’Exploiter and the supervision of complementary missions (topo, geotech…)

PROGRAM :

  • Torrent du Taconnaz module at water intake : 720 l/s
  • Equipment flow rate : 1080 l/s
  • Net drop : 406 m
  • Installed power : 3650 kW
  • 1,735 ml penstock – ∅ 800 m
  • Underwater intake with degreaser/desander
  • PELTON multi-jet turbine
  • VOLTALIA
  • 2019