FONTENAY-TRESIGNY SWIMMING POOL REHABILITATION IN PROGRESS

Piscine de Fontenay Trésigny

Our mission

Construction work in progress on the complete project management for the technical and energy rehabilitation of the town of Fontenay-Trésigny’s intercommunal swimming pool, in the Seine-et-Marne department :

  • Replacing obsolete equipment and controlling service levels
  • Lower energy consumption
  • Lower water consumption

The aquatic facility has a swimming pool activity (school and general public), as well as a wellness activity (sauna, Hammam and SPA).

The environmental approach

Solutions have been implemented to drastically reduce gas, electricity and water consumption, with :

  • The replacement of energy production with 2 condensing boilers
  • The lowering of water regimes to supply heat emitters
  • The replacement of ventilation, air treatment and water  equipment :
    • The basin hall air handling unit with a Thermodynamic model, with heat recovery from the basin water
    • The basin hall ventilation ducts for induction versions, in order to lower the air circulation rate of the AHU (air handling unit) and therefore the electrical consumption of the fans
    • All ancillary air handling units in double-flow version with plate heat exchanger on the air
    • Showers, in order to save 25 % of domestic hot water
    • Filtration pumps for high-efficiency versions equipped with variable speed drives

The implementation of air detassification during filter washing procedures in order to limit water losses by 15 to 20 %.

The installation of a GTB (Gestion Technique du Bâtiment), to monitor these consumptions as closely as possible and be able to fine-tune them during operation.

Amount of work

€560,000

  • Fontenay-Trésigny (Seine-et-Marne)
  • Syndicat Intercommunal d’Elaboration et de Gestion d’un Centre de Loisirs (SIEGL)
  • Fin 2024
  • 2300 m²