Project management for flood relief works on the Cadière river

OUR MISSION :

Project management for the design and construction supervision of flood relief works at La Cadière (13).

PROGRAM :

Four phases  :

  • Recalibration of the watercourse and creation of a submersible terrace (from a capacity of 30 m3/s to 90 m3/s),
  • Flow distribution and flood channel feeding structure,
  • Relief channel :
  • Outlet into Bolmon pond : dissipation cone, reedbed
  • Syndicat Intercommunal d’Aménagement du ruisseau de La Cadière
  • 2020