Project management for flood relief works on the Cadière river
OUR MISSION :
Project management for the design and construction supervision of flood relief works at La Cadière (13).
PROGRAM :
Four phases :
- Recalibration of the watercourse and creation of a submersible terrace (from a capacity of 30 m3/s to 90 m3/s),
- Flow distribution and flood channel feeding structure,
- Relief channel :
- Outlet into Bolmon pond : dissipation cone, reedbed