Project management for the extension of the wastewater treatment plant – Laon

Our mission :

Project management for the extension of the Laon (02) wastewater treatment plant Capacity : Extension from 40,000 to 58,000 p.e.

System : Extension by advanced treatment (organic matter + nitrogen and phosphorus) with sludge digestion production and valorization of biogas.

Tertiary treatment Stormwater treatment, 1.1m3/s Sludge treatment : digestion with co-entrants, with valorization by grid injection

  • Nitrogen treatment performance : < 10 mg/l
  • Phospore treatment performance : =< 0,4 mg/l