Aller au contenu
Résultats

PURIFICATION PLANT DU TOUVET

Our mission :

Project management for the construction of the SADI wastewater treatment plant and its discharge collector.

Program :

  • Validation of the preliminary design,
  • Development of the project,
  • Development of the tender documents,
  • Assistance in choosing the builder,
  • Development of the contract,
  • Assistance in monitoring the work,
  • Assistance with acceptance operations,
  • Assistance during the warranty period.

Filières mises en oeuvre :

  • Water treatment by activated sludge,
  • Sludge treatment by centrifugation and solar drying,
  • Odor treatment by biological deodorization,
  • Biological grease treatment.
  • Saint-Hilaire-du-Touvet
  • Syndicat d’Assainissement des Iles.
  • 2008