Restructuring and refurbishment of the swimming pool – Antibes-Juan-les-Pins
OUR MISSION :
Creation restructuring and rehabilitation of outdoor pools and construction of a building. Transformation of the diving pit into an Olympic pool with 8 water lines (50×20).
Renovation of the existing Olympic pool and construction of premises dedicated to associative activities, clubs and high-level athletes, as well as technical operating premises.
Environmental Mediterranean Sustainable Building (BDM) environmental quality approach.